Facade in glass

Connection gangway between the exhibition building and the Swissotel Le Plaza.

The gangway was prefabricated in two major elements for transportation to the site.
Assembly of the structure in one night.
Façade elements were prepared as prefabricated elements enabling extremely short assembling period on site.