Arnold&Son

The new watchmaking plant was built as an independent lightweight structure in steel on the roof of an existing building from the 1960s.
To ensure a glare-free working environment and optimized thermal insulation in the watchmaking workshops, the entire facade is covered with an additional textile skin.

Project
Construction of the lightweight structure including the outer textile membrane.
Construction:
Steel supporting structure
Insulated building envelope (roof structure, wall cladding, built-in elements, soffits)
Membrane facade including substructure to the main steel structure

Adresse

Boulevard des Éplatures 38, 2300 La Chaux-de-Fonds

Client

Arnold & Son

Architect

SPAX GmbH

You might also be interested in the following references

V-Cableway

  • Skylight
  • Facade
  • Mullion-Transom Facade

ZHAW new building “Reidbach”

  • Facade
  • Window
  • Rear-Ventilated Facade
  • Porch
  • Mullion-Transom Facade

B City, Basel

  • Window
  • Door
  • Mullion-Transom Facade