Rytz area roofing

Rytz AG realized an area roofing with intermediate platform. The roofing with the simple name “Hall 6” enabled an extension of the urgently needed storage area. The adjacent production halls two and five can be served via the open area without any risk of wetness.

Project
The area roof has a size of 39.50 x 15.30 meters (LxW).

The steel construction requires 70 tons of steel. The roof will be covered above the platform with normal trapezoidal sheet metal; in the area of the platform with translucent polycarbonate trapezoidal profiles to make use of daylight.

On the north side, lamella elements are arranged as weather protection.

The assembly of the structure was carried out in-house. The long-standing employees in the company’s own assembly teams erected the steel structure in record time, taking into account all safety guidelines.

Adresse

Hauptstrasse 1, 4455 Zunzgen

Client

Kurt Rytz

Architect

Ardiba AG

Facts
total area 40x15m
roof area 650m2
intermediate floor 200m2
steel 70 tons

You might also be interested in the following references

Coop City Pfauen, Total refurbishment, Basel

  • Flat Roof
  • Window
  • Door
  • Rear-Ventilated Facade

ZHAW new building “Reidbach”

  • Facade
  • Window
  • Rear-Ventilated Facade
  • Porch
  • Mullion-Transom Facade

Wankdorf City Bern

  • Skylight
  • Steel-Window
  • Alu-Window
  • Window
  • SHV-Elements
  • Mullion-Transom Facade